Process
How a retaining wall project runs
The visible wall goes up last. Most of the work is underground.
This is an independent referral guide. It connects homeowners with independent providers and may receive compensation. It is not a licensed contractor and it does not do the work.
- Assessment. Height, soil, loads, and drainage.
- Design. City tables or engineered plans.
- Plot plan and permit. The guideline asks for a plot plan showing the wall location.
- Excavation. Utilities marked first.
- Footing inspection.
- Block and steel. Pre grout inspection.
- Grout and drains. Backfill and drainage inspection.
- Backfill and final.
Sources
Public pages, linked so you can read the source yourself. Rules change, so confirm the current version with the agency before you rely on it.
Describe the wall when you are ready
Include whether it is moving and what sits on top. Call, text, or open a prefilled text from the estimate form.