Inspections

The four inspections in Escondido's guideline

The city's retaining wall guideline lists inspections at several phases. Each one checks work that gets buried by the next step.

This is an independent referral guide. It connects homeowners with independent providers and may receive compensation. It is not a licensed contractor and it does not do the work.

The inspections

  1. Footing. When the footing is dug and the steel is tied in its final position, before concrete.
  2. Masonry pre grout. When block is laid and steel is in place, before grout.
  3. Backfill and drainage. After grouting and after rock or rubble wall drains are in place, before earth backfill.
  4. Final. When all work is complete.

The plan on site

The guideline says the permit and plans must be available for the inspector. For standard walls, the completed guideline serves as the approved plan once the permit is issued.

Ask your provider

Ask them to show you each inspection result. Once soil goes back, the drain and steel are out of sight.

Sources

Public pages, linked so you can read the source yourself. Rules change, so confirm the current version with the agency before you rely on it.

Describe the wall when you are ready

Include whether it is moving and what sits on top. Call, text, or open a prefilled text from the estimate form.

Text Call(602) 767-0428